top of page

Fabrication Process

Murmur is constructed of precast concrete, dyed black, and polished to a terrazzo finish exposing the Georgia marble aggregate within. A four part mold was constructed at the Digital Fabrication Laboratory at Georgia Tech utilizing parametric design software integrated with CNC machining to create a two way coffer system of plywood. The total 7,900 pound sculpture was then cast and polished at Dex by Gate in Atlanta.

20211101_151329.jpg
20210722_195130.jpg
20210722_205955.jpg

CAM & CNC 

20210727_183555.jpg
20210912_172539.jpg
20210912_172531.jpg
20210912_172552.jpg
20210915_114820.jpg
20210730_135625.jpg

SKIN & TRIM

20210730_135551.jpg
20210915_114138.jpg

FIT UP & SET FORMS

20211101_134923.jpg
20211018_193015.jpg
20220618_112905.jpg

PLACE BLOCKOUTS

20220523_160106.jpg

CONCRETE CASTING

20220509_153426.jpg
20220526_105416.jpg
20220526_121337.jpg

ROTATE FORM & DE-MOLD

20220618_103412.jpg
20220618_140242.jpg
20220618_134640.jpg
20220618_134759.jpg
20220618_142100.jpg
20220618_154520.jpg
20220629_100309.jpg
20220618_162842.jpg
20220629_101442.jpg

GRIND AND POLISH TO FINAL FINISH

20220701_114458.jpg
20220724_122156.jpg

INSTALLATION IN PIEDMONT PARK

20220727_173229.jpg
20220727_173151.jpg
20220727_191228.jpg
20220727_190841.jpg
bottom of page